GLA HOME > GLA CASES > Project of Waster heat boiler System in Japan

Project of Waster heat boiler System in Japan

Source: GLA global logistics alliance   Release time:2017-04-25  

  • Cargo: Waster heat boiler System
  • Quantity:14
  • Size:
  • Departure Port:Zhangjiagang
  • Weight:
  • Destination:Japan

Transportation program: According to the characteristics of the project to design the best overall logistics solutions, from the factory cargo hoisting, land to the terminal, terminal ground operation with customs, warehousing and other full ground services, as well as the port to the port of destination sea charter, unloading services. To provide customers with a safe, efficient, lower cost of door to door service, the whole seamless docking.

1493100537317995.jpgQQ截图20170425140712.jpg
QQ截图20170425140719.jpgQQ截图20170425140726.jpg





Previous:Powder forming machine in Iran    Next:Project of GI STRIP in Bangladesh

Related case